This project required that 2-4" be installed across the parking lot via directional boring to connect the BGE service to the car chargers.
Installed a new transformer pad + bollards per BGE requirements
An equipment pad + four car charger pads were dug, formed and poured
Conduits and handholes were installed from the equipment pad to feed the car chargers
AUI Group installed several thousand feet of conduit via directional boring, missile boring and vibratory plow. Installed light pole foundations to improve site lighting conditions at a hospital.